Looked around at distribution boxes (too big) and busbars (also too big) and finally decided to build my own "power distribution" device. Good from 0-30a.
These are prototype 1
Prototype 2 with have ultra low profile fuses 0-40a and be staggered on the lines so they sit side by side. It cost about 100 to build this as I needed 2x -crimpers, lugs, heavy duty heat shrink, silicon wires and terminators.
Gen 2 will be smaller and nicer and not cost as much. The uber-micro fuse holders are still very pricey at near $15ea. Cost to build gen 2 will be aprox $50.
Once I install it on the battery I will post more pics.
These are prototype 1
Prototype 2 with have ultra low profile fuses 0-40a and be staggered on the lines so they sit side by side. It cost about 100 to build this as I needed 2x -crimpers, lugs, heavy duty heat shrink, silicon wires and terminators.
Gen 2 will be smaller and nicer and not cost as much. The uber-micro fuse holders are still very pricey at near $15ea. Cost to build gen 2 will be aprox $50.
Once I install it on the battery I will post more pics.